Adani Kandla Bulk Terminal Pvt Ltd

The Kandla Port Trust has decided to develop Dry bulk cargo handling facility for 14.112 MMTPA at Tuna located at western bank of Kara creek, about 40 km from existing Kandla Port on south west direction.

Kandla Port trust has decided to undertake the development, operation and maintenance of an impound dock off Tekra on BOT basis. The Kandla Port Trust has decided to develop Dry bulk cargo handling facility by maximum vessel size of 1,00,000 DWT in front side with 16.2 m dredged depth. Keeping these factors in view and logistic support required for deep draft berth in terms of backup space, railway tracks, road, etc.

Kandla Port Trust (KPT) has awarded LOA on dated 23th Feb 2012 to Adani Port & Special Economic Zone Limited to Built, Operate and Transfer basis for the development of proposed dry bulk cargo handling terminal at tuna, off Tekra, near Kandla port, India